Proven resin flooring installations delivered in live industrial enviroments – with phased working, rapid return-to-service and minimal operational disruption.

800m² Fast-Cure Quartz Installation in Live Bakery Enviroment
Delivered in phased sections within a live production environment, allowing continuous operations. Each completed area was returned to service within 60 minutes using fast-cure MMA systems.
800m² | Phased Installation | 60-Minute Return-to-Service | Live Production Environment

Case Study: 200m² Quartz Resin Floor Installation – Bacon Processing Facility
Delivered within a live food production environment, this 200m² fast-cure quartz resin system was installed in a single day. The project included the installation of a new stainless steel drainage channel and full preparation of the existing PU floor.
The area was handed back to the client just 60 minutes after completion, ensuring minimal disruption to operations.
200m² | Single-Day Installation | New Drain Installation | 60-Minute Return-to-Service | Live Production Environment